124. Plaque "60 years since the first Buzău-Mărășești railway", 1941, silver, engravers Mihai Onofrei and Constantin Iotzu, in the original box
The photos of the lot are informative and indicative, and cannot provide a highly detailed view of the object from all angles. We recommend a careful physical inspection of the lot before bidding.
124. Plaque "60 years since the first Buzău-Mărășești railway", 1941, silver, engravers Mihai Onofrei and Constantin Iotzu, in the original box
Starting price:
EUR 350
Sold
EUR 800
silver, 103 x 56 mm
Obverse: allegory: winged figure, emblem; Reverse: map with railway track
On September 13, 1872, the Bucharest – Ploiesti - Buzău - Galați - Bărboși - Tecuci – Mărășești - Roman – Suceava railway line was inaugurated. Thus, a traveler who went from Bucharest to Suceava had to go through Buzău-Galați-Tecuci-Mărășești to Suceava, so he had to make a long and costly journey. The lack of a direct link between Buzău and Mărășești was first felt during the military transports of the War of Independence (1877 - 1878), especially since the line portion in the Bărboși-Brăila area could be blocked at any time with Turkish artillery on the Danube. Immediately after the war, at the courageous initiative of Prime Minister Ion Brătianu, it was decided to entrust Romanian engineers with the construction of the Buzău-Mărășești railway. This represented a political, strategic and economic priority as it linked the railways of Moldova with those of Muntenia on the shortest route. On March 30, 1879, law no. 591, promulgated by King Carol I, was published in the Official Gazette, declaring the Buzău-Mărășești line of "public utility", the projects to be drawn up by the Ministry of Public Works. The 90 km line was studied, designed and executed between May 1879 and June 1, 1881, by the General Inspector, eng. Dimitrie Frunză, together with a group of 22 young Romanian engineers. The construction of the line cost 8,548,675.4 gold lei, respectively 93,214 gold lei/km, compared to 306,000 gold lei/km representing the cost of lines executed by foreign concessionaires. The official inauguration of the Buzău-Mărășești line was done on October 18, 1881 in the presence of King Carol I and Queen Elisabeta, Prime Minister Ion Brătianu, members of the Government, leaders of the CFR General Directorate and numerous public. The Buzău-Mărășești railway was the first line in Romania, designed and built with Romanian intelligence.
For clarifications regarding the bidding procedure, hammer price costs, guarantee, payment, and collection terms for the winning lot, we recommend carefully reading/re-reading the Bidding Regulations.
For additional information regarding the lot and the auction, please contact the Art Consultants Department.
By choosing "Accept all cookies" you agree to the use of cookies to help us provide you with a better user experience and to analyse website usage. By clicking "Adjust your preferences" you can choose which cookies to allow. Only the essential cookies are necessary for the proper functioning of our website and cannot be refused
Cookie settings
Our website stores four types of cookies. At any time you can choose which cookies you accept and which you refuse. You can read more about what cookies are and what types of cookies we store in our Confidentiality Policy.
are necessary for technical reasons. Without them, this website may not function properly.
are necessary for specific functionality on the website. Without them, some features may be disabled.
allow us to analyse website use and to improve the visitor's experience.
allow us to personalise your experience and to send you relevant content and offers, on this website and other websites.